Project Resources Database

New Eden Project

Volume II - Future water resources requirements in the marshlands area

Book 5 – Modelling. (5.3 MB) - Description of: the methodology, datasets, numerical tools (water balance, water management, hydrodynamic and socio-economic models), boundary conditions, calibration and verification. This book contains two Inserts

 

Inserts

· Book 5 - Insert 1 (2.00 MB) - Digital Elevation Model of the Marshes

· Book 5 - Insert 2 (0.98 MB) - Contour Map of the Marshlands Area

 

 

Book 6 – Planning Scenarios. (2.9 MB) - Evaluation of the benefits associated to marshlands restoration. Description of a set number of water allocation strategies for marshlands restoration in Southern Iraq. Presentation of exemplificative test cases and follow up steps. This book includes one plate and

Plates

· PLATE A.6 (21.4 MB) - Marshlands Modelling, Inflow and Outflow. Plate depicting the water balance calculation for different marshlands management strategies

· PLATE A.7 (15.1 MB) - Marshlands Management Curves. Plate providing a summary of the marshlands management rules.

· PLATE A.8 (23.2 MB) - Land Planning. Plates providing a summary of the land allocation for marshlands restoration

 

Animation

· Numerical model of the Marshes (34.3 MB) - Computer Animation showing the flooding and re-flooding processes of the marshes during normal, wet and dry years

Master Plan Last Revision

September

2006